Dynamic suppliers' risk management of large‐scale and complex equipment development
Abstract
Purpose
The paper attempts to establish a two‐dimension frame to analyze dynamic supplier risks of large‐scale and complex equipment and study the probability distribution of the occurring risks.
Design/methodology/approach
Starting from the dynamic and correlated supplier risks of large‐scale and complex equipment, a two‐dimension frame to analyze these risks is established. A maximum entropy model is also built to research the probability distribution of the risks; then, K‐T conditions are proved to solve the model. A real case is also studied in the last part of the paper.
Findings
The results are convincing: in order to analyze the supplier risk dynamically of large‐scale and complex equipment development project, a two‐dimension analysis frame is established and a maximum entropy model is worked out. The case study shows that they are valuable.
Practical implications
The two‐dimension frame gives a new viewpoint for risk management, but also the maximum entropy model supplies a valuable method for risk management.
Originality/value
The paper succeeds in creating a dynamic analysis frame to study risks and building a new method to research the disciplines of the dynamic risks.
Keywords
Citation
Yuan, W., Liu, S. and Yuan, C. (2012), "Dynamic suppliers' risk management of large‐scale and complex equipment development", Kybernetes, Vol. 41 No. 7/8, pp. 839-850. https://doi.org/10.1108/03684921211257694
Publisher
:Emerald Group Publishing Limited
Copyright © 2012, Emerald Group Publishing Limited