Integrated performance measurement systems: a development guide
International Journal of Operations & Production Management
ISSN: 0144-3577
Article publication date: 1 May 1997
Abstract
The performance management process is seen as a closed loop control system which deploys policy and strategy, and obtains feedback from various levels in order to manage the performance of the business. The performance measurement system is the information system which is at the heart of the performance management process and it is of critical importance to the effective and efficient functioning of the performance management system. Research identifies two critical elements with respect to the content and structure of the performance measurement system. These are: integrity and deployment. The viable systems model (VSM) provides a framework for assessing the integrity of the performance measurement system. The reference model developed for integrated performance measurement systems provides a framework against which performance measurement systems can be designed and audited.
Keywords
Citation
Bititci, U.S., Carrie, A.S. and McDevitt, L. (1997), "Integrated performance measurement systems: a development guide", International Journal of Operations & Production Management, Vol. 17 No. 5, pp. 522-534. https://doi.org/10.1108/01443579710167230
Publisher
:MCB UP Ltd
Copyright © 1997, MCB UP Limited