Approaches for commissioning time reduction
Rolf Bernhardt
(Director for Robotics Research at Fraunhofer‐Institute Production Systems and Design Technology (IPK‐Berlin), Berlin, Germany. Tel: +49 3039006 156. Fax: +49 30 391 1037)
400
Abstract
States that manufacturing lines cannot be used for production during commissioning and that it is therefore always the goal to reduce the necessary efforts to a maximum extent. Starts with a description of the state‐of‐the‐art in this field based on the situation in the automotive industry. Additionally lists RTD fields to overcome these problems. Goes on to present methods and software tools aiming at a tremendous decrease in efforts required today.
Keywords
Citation
Bernhardt, R. (1997), "Approaches for commissioning time reduction", Industrial Robot, Vol. 24 No. 1, pp. 62-71. https://doi.org/10.1108/01439919710162719