Case studies

Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.

1 – 10 of over 1000
Applied filters:
Accounting and Finance
Built Environment
Management Science
Operations and Logistics
Other subjects
Clear all
Case study
Publication date: 3 December 2024

Aditya Gulia and Jatin Pandey

After completion of the case study, the students will be able to understand lead and lag indicators, understand job performance and its linkage with job satisfaction, calculate…

Abstract

Learning outcomes

After completion of the case study, the students will be able to understand lead and lag indicators, understand job performance and its linkage with job satisfaction, calculate the cost of turnover and design solutions to the problem of attrition and low satisfaction.

Case overview/synopsis

Pace Control Gears was a small-scale enterprise based out of Sonipat, India. It was an entrepreneurial venture by Rajesh Kumar, who had set Pace in 2010 to manufacture low-voltage electrical apparatus. Recently, Pace had begun to experience issues with quality control that were largely the result of human error. The company was facing a drop in satisfaction levels and higher attrition levels among the employees. Kumar had to find a solution quickly to address the problem, as it had direct implications for the company’s margins and the assurance of quality that it was associated with in the market.

Complexity academic level

This case study is suited to undergraduate and postgraduate courses in human resource management and general management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 6: Human Resources Management.

Case study
Publication date: 6 November 2024

Pratik Rajendra Satpute, Gautam Surendra Bapat and Shefali Joshi

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the…

Abstract

Learning outcomes

After completion of the case study, students will be able to recall the fundamental concepts of group arrival and the check-in process within the hotel industry; explain the various operational procedures used to enhance a smooth group check-in in hotels; use the steps defined in group check-in procedure to improve service efficiency in hotel operations; and examine and evaluate the optimal solution for a smooth group check-in for hotels.

Case overview/synopsis

“The Big Fat Indian Wedding” delves into the challenges faced by Hotel Plaza Blu, a business hotel in Pune, Maharashtra, in 2023. A big wedding group was arriving at the hotel, which comprised almost 350 adults and 120 children. Mr Parag Patil, the front office manager, had done all the preparations for group arrival but just one hour before the arrival Mr Suresh Menon, the group coordinator, came and informed that 150 additional guests would be arriving, as the other hotel, where arrangements for these guests were made, had a major electricity generator breakdown and the hotel was in complete blackout. Patil had the challenge of formulating an action plan to achieve a smooth group check-in with the last-minute changes.

Complexity academic level

Executive development programmes and graduate-level courses in non-profit hospitality and tourism management might benefit from this case study. The operational management courses in the BBA, UG management programmes might all benefit from using this case study.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 21 November 2024

Desi Adhariani

The learning outcomes are as follows: to evaluate the suitability of Surplus business model from accounting, finance, strategy and cultural perspectives; to identify the factors…

Abstract

Learning outcomes

The learning outcomes are as follows: to evaluate the suitability of Surplus business model from accounting, finance, strategy and cultural perspectives; to identify the factors that contribute to the reluctance of business partners to join Surplus ecosystem and to suggest solutions; to identify the factors that contribute to the reluctance of consumers to join Surplus ecosystem and to suggest solutions; and to address unique funding and financial challenges faced by Surplus.

Case overview/synopsis

This case study discussed the challenges faced by Surplus Indonesia, a company founded upon the belief that a harmonious balance can be achieved between profitability and environmental stewardship. Stemming from the founder’s encounter with leftover food going to waste after buffets, Surplus embarked on a pioneering initiative using an application technology to address food wastage at the consumer level. Collaborating with various stakeholders such as retail outlets, restaurants, bakeries, cafes and hotels, the goal was to combat food waste while supporting Sustainable Development Goals 2, 12 and 13: Zero Hunger, Responsible Consumption & Production and Climate Action, respectively. Each meal saved through the Surplus app not only translated to reduced expenses for businesses but also contributed to reducing greenhouse gas emissions from landfills. Surplus’ overarching mission was to cut food waste and loss in Indonesia by half by 2030, fostering an environment where food waste is virtually nonexistent in the nation.

Complexity academic level

Undergraduate as well as graduate courses that focus on sustainability, accounting, financing and strategy

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and Finance.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 2 December 2024

Manish Agarwal and V.S. Prasad Kandi

After completion of the case study, the students will be able to assess Paytm’s share buyback in the context of conventional practices, especially for loss-making firms, analyze…

Abstract

Learning outcomes

After completion of the case study, the students will be able to assess Paytm’s share buyback in the context of conventional practices, especially for loss-making firms, analyze the influence of initial public offering (IPO) performance on market sentiments and the role of subsequent events in shaping investor confidence, explore the regulatory framework for share buybacks in India and its impact on Paytm’s decision, scrutinize Paytm’s post-IPO financials and evaluate the board’s rationale for the share buyback and examine the factors influencing Paytm shareholders’ decisions amid the buyback, considering market conditions and the company’s outlook.

Case overview/synopsis

This case study discusses the unorthodox choice made by Paytm, a leading Indian digital payments and financial services provider, to begin a share repurchase program just one year after its substantial IPO. Paytm encountered difficulties as its stock price experienced a sharp decline of 74% following the IPO, which raised concerns among shareholders and elicited mistrust from analysts. This case study explores the reasoning for the buyback, the legislative framework of share buybacks in India and the diverse viewpoints of analysts regarding the company’s financial strategy. This case study provides not only ample opportunity to discuss ethical issues around managers’ corporate actions but also brings investors a dilemma.

Complexity academic level

This case study is suited to Master of Business Administration/Master of Science/Bachelor of Business Administration/Bachelor of Science.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and Finance.

Case study
Publication date: 14 November 2024

Sabtain Fida, Muhammad Zahid Iqbal and Waris Ali

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining…

Abstract

Learning outcomes

The learning outcomes are as follows: to identify and analyze the importance of operations management in a situation demanding minimizing environmental impact and maintaining operational momentum; access the risks faced during project executions and apply project management concepts to facilitate Karachi Steel in implementing indigenous technological solutions; and evaluate the importance of adaptability, continuous improvement and innovation in creating sustainable solutions to address complex challenges.

Case overview/synopsis

Javaid Iqbal, CEO of Karachi Steel, was the case’s protagonist. With capacity expansion, Javaid relocated the steel facility from Rawalpindi to Islamabad, Pakistan. The company encountered several difficulties because of the air emissions’ inconvenience to nearby residents and the strict environmental regulations. To push the emissions into the air, the company first installed a locally fabricated chimney. Later, they hired a foreign Pakistani engineering firm to install air filters, but the project proved unsuccessful. To control emissions, the company developed a Wet Particulate Control (WPC) system based on a water-sprinkling mechanism. The endeavor was successful, but it resulted in water pollution. As a result, Karachi Steel signed a contract with a local engineering company that invented and effectively installed an air filtration system. Karachi Steel not only devised solutions for their predicaments but also made significant contributions toward achieving the Sustainable Development Goals (SDGs). However, the emissions reporting and monitoring mechanism continued to cause inconvenience for regulators. In addition, the filtration facility encountered a blocked duct conveying zinc sulfate from smoke, resulting in the periodic suspension of operations. As Karachi Steel seek long-term solutions to current challenges, it is critical to examine the relationship between internal circumstances and external forces and stimulate a holistic approach to resolving issues within the realms of operations management and project management.

Complexity academic level

The case study is suitable for students pursuing their undergraduate degree programs in business studies or management sciences. This case can be taught in specific subjects in the domain of management sciences, including project management and operations management. Furthermore, undergraduate students pursuing degrees in environmental sciences, specializing in environmental impact assessment and sustainable development, can also learn from this case study. These subjects have the potential to provide students with a detailed understanding of the dynamic relationship between environmental problems caused by business activities, and how to address these challenges using principles of project management and operations management. There is no pre-requisite for this case study, and the level of difficulty is moderate. The recommended teaching pedagogy for this multidisciplinary case study includes role-playing exercises, simulations to replicate real-world situations and the Socratic method, which encourages critical thinking.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 7: Management Science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 2 December 2024

Aditya Kumar Sahu

After completion of the case study, students will be able to learn to conduct the 5Cs (Customers, Collaborators, Capabilities, Competitors, Conditions) and Porter’s five forces…

Abstract

Learning outcomes

After completion of the case study, students will be able to learn to conduct the 5Cs (Customers, Collaborators, Capabilities, Competitors, Conditions) and Porter’s five forces analysis for understanding the situation of any company; to understand various demand forecasting techniques with the case example of Kaspians Café; to analyse different factors that influence the demand with the case example of Kaspians Café; and to learn how to choose the best time-series forecasting method based on the available dataset.

Case overview/synopsis

This case study focuses on operations strategy, specifically analysing the issues encountered by the Kaspians Café, a food joint establishment located within the Kaspians Institute of Management. Kaspians Café, due to its large student clientele, encountered operational inefficiencies such as inadequate inventory management, stockouts and wastage. These issues resulted in financial losses and customer dissatisfaction. This case study focuses on forecasting the demand for different food items at different times to get a better understanding of the stock to be maintained at Kaspians Café. Furthermore, Shyam Manral, the owner of Kaspians Café, was confronted with the difficulties arising from the surging popularity of neighbouring Dhabas and the escalating impact of food delivery platforms such as Zomato and Swiggy. The formerly prosperous Kaspians Café establishment, known for its uniform offers, was now encountering strong competition from the quaint ambience and varied menus of the Dhabas situated in close proximity to the campus entrance. These conventional establishments not only accommodated the changing preferences of students but also functioned as convenient centres for social meetings. The emergence of Zomato and Swiggy had revolutionised the eating patterns of students by providing a wide range of choices that were conveniently delivered to their residences, thereby diminishing the attractiveness of Kaspians Café. Manral was struggling to revive his business in light of these shifting circumstances. He pondered how to keep consumers loyal in the middle of changing cuisine preferences and the convenience provided by contemporary food delivery services.

Complexity academic level

This case study can be used in the operations management course at the MBA/postgraduate level.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 November 2024

Vaishali, Simran Gupta and Rahul Kumar

This case study aims to equip students with the skills to evaluate the rationale behind a demerger decision, derive the enterprise value and equity value of the conglomerate using…

Abstract

Learning outcomes

This case study aims to equip students with the skills to evaluate the rationale behind a demerger decision, derive the enterprise value and equity value of the conglomerate using the discounted cash flow valuation modelling and assess the company’s value based on qualitative parameters using economy industry company analysis and strengths, weaknesses, opportunities and threats analysis.

Case overview/synopsis

This case study delves into the demerger of the financial services arm of Reliance Industries Limited into a separate unit named Jio Financial Services Limited. The independence of this unit is anticipated to enhance shareholder value and unlock the conglomerate discount. In light of these factors, a fundamental analysis of the firm is conducted to determine whether it presents a viable investment opportunity.

Complexity academic level

This case study is suitable for -graduate and postgraduate courses in financial management.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and finance.

Case study
Publication date: 29 November 2024

Arvind Shroff and Bhavin J. Shah

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and…

Abstract

Learning outcomes

The authors have discussed the importance of creating socially transformative health-care ecosystems in emerging economies like India. After completion of this case study and assignment questions, the students will be able to apply the case experience to comprehend the underlying factors influencing the decision of the implementation and replication of the Sanjeevani health-care service delivery model, understand the impact of free and subsidized health-care service delivery models on social transformation, evaluate the operational performance of health-care institutions using the balanced scorecard model and create practical relevance when implementing novel health-care solutions like Sanjeevani, which has been successful due to its singular pin-pointed focus on solving the issue of congenital heart diseases (CHDs).

Case overview/synopsis

Forty thousand surgeries against 0.3 million new CHD patients every year was the unbalanced equation of pediatric cardiac care in India. It also contributed to almost 46% of total CHD prevalence in the world. This case study explores the evolution of the affordable health-care ecosystem provided by Sri Sathya Sai Sanjeevani Hospital (Sanjeevani), Raipur, Chhattisgarh, which included services ranging from OPD to postoperative surgical care, including accommodation and food, completely free of cost. Over the past eight years, it had managed over 80,000 pediatric cardiac outpatients and performed over 9,000 surgeries. This case study also outlines the execution of Sanjeevani, as an affordable health venture aimed at producing social transformation. The pertinent question to be explored is, “Can the Sanjeevani healthcare ecosystem be replicated, both operationally and financially?”

Complexity academic level

This case study is suited to undergraduate Bachelor of Business Administration, Master of Business Administration (MBA) and executive MBA.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Case study
Publication date: 28 October 2024

Niaz Ahmed Bhutto, Abdul Rehman Shaikh and Sanober Shaikh

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the…

Abstract

Learning outcomes

The learning objectives of this case study based on Bloom’s Taxonomy (Bloom et al., 1956) will be to analyze the procurement process and identify the parameters for the procurement of services; evaluate the potential risks and challenges associated with relying on a single vendor for critical services; apply the four-stage model of crisis management to the breach of contract by Fresh Bites Catering; examine how adopting sustainable procurement practices, such as diversifying suppliers and establishing contingency plans, can mitigate these risks and ensure business continuity; and analyze the dynamics, roles and potential conflicts between the principal (Multan University) and agent (Fresh Bites Catering) using the principal–agent theory (PAT).

Case overview/synopsis

This case study explores the challenges and implications of sustainable procurement within the context of Multan University’s cafeteria services. It delves into the sudden contract breach by Fresh Bites Catering, a long-time partner responsible for providing central cafeteria services, and examines the resulting operational crisis faced by the university. This case study highlights key procurement processes, including vendor selection, contract management and adherence to sustainability principles, as well as the risks associated with single-vendor dependency. By applying frameworks such as the PAT, the four-stage model of crisis management and sustainable procurement practices, this case study encourages students to critically assess the failures in contract enforcement, risk mitigation and service continuity. Additionally, it stimulates discussion on the benefits of robust risk management strategies, multi-vendor approaches and clear contract terms to prevent future disruptions in essential services. This case study serves as a valuable tool for understanding how procurement strategies influence organizational performance and long-term sustainability in higher education institutions.

Complexity academic level

This is a decision-making case and can be taught in Master of Business Administration courses in purchase and supply management and operations management. This case study is mainly written to make students understand and analyze the potential risks of a single vendor, the benefits of diversifying suppliers and sustainable procurement.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and logistics.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 10 October 2024

Sunil Kumar and Ravindra Shrivastava

Risk identification and qualitative assessment are the learning outcomes.

Abstract

Learning outcomes

Risk identification and qualitative assessment are the learning outcomes.

Case overview/synopsis

The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.

The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?

The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?

Complexity academic level

Undergraduate and post graduate courses in project management, civil engineering and architecture domain.

Supplementary material

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

1 – 10 of over 1000