Case studies
Teaching cases offers students the opportunity to explore real world challenges in the classroom environment, allowing them to test their assumptions and decision-making skills before taking their knowledge into the workplace.
Sunil Kumar and Ravindra Shrivastava
Risk identification and qualitative assessment are the learning outcomes.
Abstract
Learning outcomes
Risk identification and qualitative assessment are the learning outcomes.
Case overview/synopsis
The Bharat Bijlee Construction Limited (BBCL) was one of the largest construction companies operating in the power sector in India. After successfully completing a few projects in the Middle East, BBCL decided to expand its presence into African region. The BBCL was awarded a $85m contract for three sub-station projects to modernise Algeria’s power grid system by the “Shariket Karhaba Koudiet Eddraouch Spa”, a state-owned company in charge of power generation, transmission and distribution in Algeria.
The project, which is the first of BBCL in Saharan region in Algeria’s, presents many unique situations that company had never encountered before, including sand dunes, severe weather, remote locations, supply chain & logistics, strict contractual deadlines and a high level of construction risk. The project manager for BBCL was sceptic about how well his company would perform under the present project circumstances. How could he better align himself with the client, the various on-site local contractors and the numerous suppliers spread around the world?
The case emphasises the identification of various project risks that the project manager might encounter in the project. What do the PESTLE and ASCE frameworks for risk identification each represent, and how are they helpful for the project team in understanding various risks? How should the project’s qualitative risk assessment be conducted? And how can a heat map be a better tool for comprehending the criticality of each risk in the project?
Complexity academic level
Undergraduate and post graduate courses in project management, civil engineering and architecture domain.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS 2: Built Environment.
Details
Keywords
Sunil Kumar and Ravindra Shrivastava
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues…
Abstract
Learning outcomes
After completion of the case study, the participants will be able to understand the significance of quality as a pivotal domain within project management and to analyze the issues related to quality and offer logical solutions.
Case overview/synopsis
In this case, the Bharat Bijlee Construction Limited (BBCL) group, with a proven track record of over five decades in the transmission and distribution business in India, decided to venture into international projects, considering the prevailing stagnant domestic power sector. They secured contracts worth $85m from the “Shariket Karhaba Koudiet Eddraouch Spa,” a state-owned company responsible for power generation, transmission and distribution in Algeria. However, during the execution phase of these projects, BBCL encountered significant challenges related to product and service quality. These challenges arose due to the tight schedule constraints and cost considerations, as well as a lack of understanding of the dynamics involved in executing international projects, especially in the demanding conditions of the sub-Saharan desert. This case study addresses the complex issue of ensuring and maintaining high-quality standards in large-scale substation projects situated in the challenging environment of the sub-Saharan desert, highlighting the importance of effective project management and international project execution expertise. The case study is from quality management knowledge area and focuses on identification of root cause of quality noncompliance and for better decision-making in projects.
Complexity academic level
The teaching case is designed for undergraduate and postgraduate courses in project management, civil engineering and architecture domain. The participants will be able to understand the application of various quality tools, statistical process tools and control charts in problem identification, categorization, root cause identification and decision-making.
Supplementary material
Teaching notes are available for educators only.
Subject code
CSS2: Built environment
Details
Keywords
After completion of the case study, the participants would be able to understand the challenges in building a sustainable homestay tourism business; develop a positioning…
Abstract
Learning outcomes
After completion of the case study, the participants would be able to understand the challenges in building a sustainable homestay tourism business; develop a positioning statement for La Pinekonez which builds a unique competitive advantage; and outline elements of the business strategy to profitably sustain and grow a sustainable tourism homestay in terms of service offering, pricing, marketing and operations.
Case overview/synopsis
La Pinekonez Homestay, located in the beautiful region of Himachal Pradesh, India, is the subject of this case study, which explores both its successes and its difficulties. In August 2022, Arvind, the dedicated sole proprietor of La Pinekonez, grappled with multifaceted challenges, the first being the foray of established hotel chains into the homestay business. As the protagonist, was is in dilemma of preserving La Pinekonez’s unique identity amidst corporate competitors, particularly with regards to differentiating from the expanding hotel chains. The clash between customer expectations for hotel-like amenities and the homestay’s commitment to sustainable tourism presented a crucial challenge. Negative reviews questioning the authenticity of La Pinekonez’s green initiatives heightened the complexity. Adding to Arvind’s predicament were the seasonal fluctuations in tourist inflow and his aspiration to embrace immersive tourism trends. This case study facilitates exploration of strategic positioning, sustainability management and marketing strategies in the dynamic and competitive hospitality industry. It also offers insights into the complexities of balancing differentiation, customer satisfaction and sustainability while navigating the evolving landscape of tourism trends.
Complexity academic level
This case study is suitable for students of tourism and hospitality management at postgraduate level. The case study can be discussed once the basic concepts of hospitality management and service dimensions are covered.
Supplementary material
Teaching notes are available for educators only.
Subject code
CCS 12: Tourism and hospitality.
Details
Keywords
Anh Dung Vu, Kyunghwa Chung and Ha Kyung Lee
This case study provides in-depth, practical knowledge to develop business strategies for the management program. After reading this case study, the students will be able to learn…
Abstract
Learning outcomes
This case study provides in-depth, practical knowledge to develop business strategies for the management program. After reading this case study, the students will be able to learn about the challenges and problems that service firms face during a crisis, the drastic changes in the market environment due to a crisis and the analysis tools that can be used when analyzing the shifted market environment. By analyzing this case study, students will be trained for the decision-making that arises in the process of crisis management in the hotel industry.
Case overview/synopsis
Nam Nghi Resort, situated on the picturesque Phu Quoc Island in Vietnam, experienced the tumultuous period of the COVID-19 pandemic. Before the pandemic, Nam Nghi was a thriving five-star resort, deeply rooted in Vietnamese culture and renowned for its luxurious amenities and breathtaking location. However, the onset of COVID-19 brought unprecedented challenges to the hospitality industry, leading to a sharp decline in tourism and revenue. Despite the adversity, Nam Nghi implemented risk management practices successfully and displayed resilience and adaptability. Through rigorous cost minimization, strategic facility upgrades and targeted marketing efforts, Nam Nghi managed to navigate the crisis and gradually rebuild its business as travel restrictions eased. As the industry began to show signs of recovery, the general manager faced new challenges in restoring the resort’s prepandemic vitality. The challenge remained of understanding changing consumer values and market dynamics.
Complexity academic level
This case study can be used as class material for Master of Business Administration (MBA) students. In particular, MBA students in the hospitality industry such as hotels, resorts, travel agencies and restaurants are the target audience.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 12: Tourism and hospitality.
Details
Keywords
Pratik Satpute and Gautam Surendra Bapat
The learning outcomes of this study are to recall the fundamental concept of revenue management in the hotel industry (remembering); explain the various performance measures used…
Abstract
Learning outcomes
The learning outcomes of this study are to recall the fundamental concept of revenue management in the hotel industry (remembering); explain the various performance measures used to evaluate room revenue in hotels (understanding); use revenue management strategies to improve room revenue in hotel operations (applying); and examine and evaluate the optimal solution for revenue enhancement, considering factors such as capacity management, duration control and differential pricing (analyzing).
Case overview/synopsis
This case study delves into the challenges faced by Hotel King’s Cross, a business hotel located in Pune, Maharashtra, in the year 2022. A week before Christmas Eve, Soham Dande, the hotel’s revenue manager, sought a meeting with Rohan Chopra, the director of sales and marketing, to discuss “revenue optimization for the hotel.”
During their meeting, Dande mentioned that the hotel had fallen behind its budgeted room sales targets for 2022 across various metrics, such as room booking nights, occupancy percentage, average room rate and revenue per available room. Furthermore, the hotel was trailing behind its competitors. The situation was compounded by the management’s decision to raise the targets for 2023 by 5%–7%, factoring in upcoming events, competitive performance and pandemic-related losses over the past two years. Chopra faced the dilemma of formulating an action plan to achieve the ambitious 2023 targets and establish Hotel King’s Cross as a market leader.
Complexity academic level
Students undertaking executive development programs and graduate-level courses in non-profit hospitality and tourism management, as well as revenue management courses in the executive MBA, management development and graduate MBA programs, may all benefit from this case study.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS12: Tourism and hospitality.
Details
Keywords
This case study aims to stimulate the students’ thoughts about the introduction of sustainability and its importance in the travel and tourism industry and introduce the concept…
Abstract
Expected learning outcomes
This case study aims to stimulate the students’ thoughts about the introduction of sustainability and its importance in the travel and tourism industry and introduce the concept of resilience and building of dynamic capability of a venture from the perspective of an entrepreneur.
Case overview/synopsis
Established in 2009, India Someday was a fledgling travel company based in Mumbai, India. The team comprised passionate travellers who provided planning assistance for those willing to explore India independently. The company offered customised, personalised and tailor-made trips to create a memorable travel experience for travellers with differing budgets and age groups. Upon the launch of Asia Someday, an extension of the travel venture India Someday, Mr Asif Munshi shared a moment of relief as he shook hands with his co-founder, Mr Harsh Shirodkar. The pandemic significantly impacted the tourism industry, yet it fortified their entrepreneurial spirit and inspired them to bounce back with a dynamic and vigorous comeback and further strengthened the foundation of the endeavour. The expansion of their entrepreneurial venture marked the initiation of the second innings of their enterprise. Although the company had managed to stay afloat because of savings, it was soon depleted. But the withdrawal of the no-fly list and the gradual opening of borders brought a ray of hope for India Someday. Munshi was preoccupied with his thoughts about the future steps of his dream venture. With emails from his previous clients regarding travel plans to India, he could see that the prior impact of India Someday had not gone in vain. Although relieved with the commencement of people travelling, the future was uncertain and the founders knew that they had to be prepared to successfully operate their venture.
Subject area
Tourism and hospitality courses/entrepreneur courses
Study level/applicability
Beginner
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 12: Tourism and hospitality.
Details
Keywords
Chitra Singla and Bulbul Singh
Madan Mohanka set up Tega Industries Ltd in 1976 to manufacture abrasion-resistant rubber mill lining products used in the mining and mineral processing industries. In 2006, as…
Abstract
Madan Mohanka set up Tega Industries Ltd in 1976 to manufacture abrasion-resistant rubber mill lining products used in the mining and mineral processing industries. In 2006, as part of its inorganic expansion strategy, Tega bought a mill-liner company in South Africa. Buoyed by this growth, two acquisitions were made in Australia and Chile in the year 2011. However, post-acquisition, several managerial, legal and commercial problems crept up in its manufacturing facilities in Chile, leading to financial downturn in Tega's fortunes in 2016 and compelling it to either plan a revival or divest its interest in its Chilean Plant.
Details
Keywords
What started as a FMCG distributor in 1967 in Kenya as Export Finance Company, is now a dynamic global conglomerate across 48 countries and 5 continents — Export Trading Group…
Abstract
What started as a FMCG distributor in 1967 in Kenya as Export Finance Company, is now a dynamic global conglomerate across 48 countries and 5 continents — Export Trading Group. ETG was taken over by the then CFO Mahesh Patel after exit of the founding stakeholders. It was then when the company shifted its focus to being a key regional player. In the next 35 years, the company grew systematically. Business focus evolved when Patel saw an opportunity in logistics in remote sub-Saharan Africa. This was followed by business expansion with supply chain diversification and significant infrastructure investments. All the different businesses amalgamated under a single group for better operations and ease of scaling up. They were later divided into six separate verticals for better management. Vamara (FMCG vertical) was launched in 2018 as the company moved towards digitalisation — externally and internally. ETG plans to focus on new business opportunities and continue to diversify across geographies and portfolios.
Details
Keywords
Sundaravalli Narayanaswami and N Ravichandran
Jarsh Safety received an order of 500 units of its Model S helmet. However, the order must be delivered within 15 days. Jarsh Safety was founded by three engineering college…
Abstract
Jarsh Safety received an order of 500 units of its Model S helmet. However, the order must be delivered within 15 days. Jarsh Safety was founded by three engineering college peers, who conceptualized air-conditioned, industrial safety helmets. This innovative revolutionary product offered industrial workers not only safety but aesthetics and comfort. The founders hoped that the product could change the perception of safety helmets from mandatory wear to desired wear. The case details the production process, staffing, raw material required and procurement lead time.
Details
Keywords
Subject
Country
Case length
Case provider
- The CASE Journal
- The Case for Women
- Council of Supply Chain Management Professionals
- Darden Business Publishing Cases
- Emerging Markets Case Studies
- Management School, Fudan University
- Indian Institute of Management, Ahmedabad
- Kellogg School of Management
- The Case Writing Centre, University of Cape Town, Graduate School of Business